Stöcklin Logistik AG has completed a prestigious project for the online merchant BRACK.CH, part of the Competec Group, in Willisau in the canton of Lucerne. The new facility has attracted a great deal of public interest, with CHF 70 million ($76,078,000) invested in developing the existing property into one of the most up-to-date logistics centers in Europe. Optimal availability and the shortest delivery times are guaranteed for a product range of over 200,000 products. The core of the expansion is a parts warehouse with almost 100,000 locations and a fully-automated, eight-lane pallet warehouse in which one lane is explicitly configured as cassette storage.
When it became evident that expanding the Competec logistics center in Willisau was unavoidable, coronavirus was still far off. Consequently, the expansion plans were not originally attributable to the e-commerce boom spurred by the pandemic. Instead, they were due to the rapid development of all the trading companies in the Competec Group. In addition, the online merchant BRACK.CH recognized the signs of the times early on and successfully turned to e-commerce. More than 200,000 products – from tiny USB sticks to complete party tents – are in stock and delivered to more than 1.2 million private and business customers. The multiple prize-winning online shop offers customers shopping experiences in six worlds: IT & Multimedia, Hardware Store & Hobby, Household & Living, Supermarket & Drugstore, Family & Baby and Sport & Leisure – each with novelties, best sellers, campaigns, information and services.
Decades-long partnership redesigned
The success story of the Swiss trading company began in 1994, initiated as a sole proprietorship by Roland Brack, who is also the founder and owner of Competec. The Swiss e-commerce specialist has been present in Willisau, Lucerne since 2011. It was there that the previous LEGO plant, one of the production locations of the bright cult building blocks, was converted into a partially automated logistics center and has been in productive use ever since. However, continuing growth led to the storage space in the 55,000 m² (592,015 sq ft) building becoming increasingly cramped by 2017. At the same time, online customers came to expect fast and more flexible delivery options with an increased product range. As a result, Competec decided to expand the logistics center by 20,000 m² (215,278 sq ft) and equip it with the latest technology.
The green light for implementation came at the beginning of 2019, when Stöcklin Logistik AG was commissioned as general contractor to install a fully automated pallet warehouse and medium parts warehouse. “The Swiss intralogistics specialist prevailed with the best solution in the face of international and national competition while also being a long-standing and valued partner of Competec,” reported Thomas Gasser, CEO of Competec Logistik AG. “Stöcklin already built the existing automatic high-bay warehouse in the mid-1990s in the LEGO plant and assisted us in 2011 and 2012 during the retrofit of this installation.”
Ad hoc complete expansion instead of phased expansion
Then coronavirus arrived. The outbreak of the pandemic triggered huge demand for the products offered by BRACK.CH: “During the lockdown, the demand for many existing product ranges, but above all in the new supermarket and drugstore ones, grew disproportionally,” explained Gasser. This upsurge had to be mastered logistically. In addition, it was necessary to cope with the increased volume requirements created especially by the expansion of the food on offer. This is why Competec decided on the rapid expansion of the logistics center to 75,000 m² (807,000 sq ft) in July 2020. The previous, already significant, CHF 50 million ($54,300,000) turned into CHF 70 million ($76,078,000).
The updated project required flexibility, creativity, and manpower from Stöcklin Logistik AG. “Our team was faced with the task of installing a medium parts warehouse with 97,000 storage spaces for trays, a pallet high-bay warehouse with 26,600 storage spaces and cassette storage with 1,330 spaces for large products along with 6 kilometers (3.72 miles) of conveyor technology in next to no time,” recalled Urs Martin, Sales Director, Switzerland/Austria at Stöcklin Logistik AG. This ambitious project was successfully concluded with the symbolic handover of the keys for the automated systems in mid-March 2022 to Competec. The conveyor technology is connected to the existing property in Willisau and successively assumed operation by the end of 2021.
Pallet warehouse with customized features
In a first step, the high-bay pallet warehouse, which is divided into two sectors, began operations in May of 2021. It comprises eight lanes in total, seven of which are intended to accommodate EURO1 pallets and internal pallets with dimensions of 1,200 x 1,200 mm (~48” X 40”). Moreover, these load carriers are used in combination with pallet cages. Internal pallets are used in parallel as support for one-way pallets and bulky articles. For this, 26,600 storage spaces with double-deep longitudinal storage are available, which can bear a weight of up to 600 kg (1,322 lbs). The seven stacker cranes, each almost 34 m (112 ft) heigh and fitted with double-pronged telescopic forks, produce overall mechanical output of 215 double cycles per hour if necessary. To achieve this, devices from Stöcklin’s MASTer product series were fitted with two synchronously running drives, which guarantee enhanced acceleration and travel performance.
Another lane with 1,330 storage space is reserved for the storage of (steel) cassettes with the dimensions 3,750×1,200×600/1,200/1,800/2,400 (LxBxH). These are intended for interim storage of large products. In order to safely load and transport the cassettes together with their additional load of up to 900 kg (1,984 lbs), the designers fitted the stacker cranes with specially designed load-handling attachments. The performance of the device is 85 double cycles an hour.
As part of the active fire prevention precautions, the entire pallet high-bay warehouse, erected as a silo, was rendered inert. The reduced oxygen saturation prevents fire from igniting. Moreover, conveyance for all eight lanes of the high-bay warehouse is connected to the incoming and outgoing goods areas, where 170 pallets are fed into the system circuit per hour or prepared for dispatch.
Twenty “BOXer” stacker cranes provide for speed in the medium parts warehouse
Contrary to the original plan to equip the medium parts warehouse with ten cranes, a decision was taken to start directly with the full expansion – i.e. with twenty cranes. Consequently, there are now 97,000 single-depth places for plastic trays with a surface area of 660 x 860 mm (~26” x34”) and up to 50 kg (110 lbs) additional load in the expanded Competec logistics center. At peak times, the twenty BOXer stacker cranes achieve an impressive performance of 1,800 double cycles per hour. They are 19 m (52 ft) high and like the stacker cranes in the pallet warehouse, each have a camera system on the raising platform, thus ensuring precise infeed and discharge of the loading units. The lowest possible emission sound pressure level was also important to Competec/BRACK.CH. “To deal with that on the machine level as far as possible, a technically elaborate solution was implemented with decoupled travel and guide rails, which greatly reduces the oscillations,” explained Stöcklin’s Martin.
“A building like this doesn’t get built in Switzerland every day.”
The just-in-time and just-on-budget implementation is also a tribute to the committed, success-oriented cooperation of the project team at Competec and the intralogistics specialists, according to Urs Grütter, chairman and management board delegate of Stöcklin Logistik AG: “A milestone was successfully reached.” Competec’s owner, Roland Brack, was also happy at the handover of the keys: “A building like this, which makes a direct contribution to delivering speed and reliability, doesn’t get built in Switzerland every day. We’re no longer held back by lack of space and thanks to automated processes, we’ll also be in a great position to offer the best customer experience online in the future and to improve the shopping experience yet again.”
Constant availability with growing product range diversity
In the past, more than 3.7 million packages were delivered to private, business and trading customers throughout Switzerland and that is expected to be higher in 2023 even if the demand via the BRACK.CH online shop has plateaued. The availability of the products across all experience worlds has risen enormously and meets the desire of B2B and B2C customers for short delivery times and faultless, complete shipments. Moreover, the improved degree of volume utilization has the advantage for Competec of generating increased sales. This is because during the lockdowns many customers learned to appreciate the comfort of ordering goods online and having them delivered to the front door. In the medium parts warehouse in particular, 80,000 storage spaces are already occupied. Hence, with the remaining almost 20,000 there is an adequate buffer for accommodating additional product worlds, which are in huge demand, particularly during heavy sales periods, such as the Cyber Week beginning on Black Friday and also in the run-up to Christmas.
BRACK.CH experienced substantial performance improvement as a result of implementing the Stöcklin intralogistics solution, enabling the company to serve its customer better and faster.
Recent Comments